An inspection of the pier to determine its structural arrangement and general condition. This was a high-level inspection, providing general observations and preliminary recommendations. This assessment was performed to help HPHA plan the next steps in the preservation of the pier.

Following our project to protect the south side building from further deterioration, we have made temporary repairs to the roof and floor of the north side building. This building houses the waiting room.

Enhance the entrance to the pier and to make it more welcoming by painting, repairing, installing new roof edging and planting lots of flowers.

Protection of the pier-head south side building installing a new roof and repairing the walls and floor.